MIL-P-80041D
All items shall meet all requirements
4.1.1 Responsibility for compliance.
in this specification shall
T h e inspections set forth
of sections 3 and 5.
inspection
system or quality
become a part of the contractor's overall
program.
The absence of any inspection requirements in the specification
shall not relieve the contractor of the responsibility of ensuring that all
products or supplies submitted to the Government for acceptance comply with
Sampling
inspection,
as
part
of
all
requirements
of
the
contract.
m a n u f a c t u r i n g o p e r a t i o n s , i s a n a c c e p t a b l e p r a c t i c e t o a s c e r t a i n conformance
to requirements, however, this does not authorize submission of known
defective material, either indicated or actual, nor does it commit the
Government to accept defective material.
4.2 Classification of inspections.
The
inspection
requirements
specified
herein are classified as follows:
First
article
inspection
(see
4.4).
a.
Quality conformance inspection (see 4.5).
b.
Acceptance test (see 4.6).
c.
otherwise
Unless
specified
(see
6.2),
all
4.3 Inspection conditions.
,
inspections
the test
conditions
shall
be performed in accordance with
specified in 4.1.1.
4.4 First article insertion.
When a first article inspection is required,
it shall be applied to the first article submitted in accordance with 3.1.
first article inspection shall consist
Unless otherwise specified (see 6.2),
of the examination in 4 . 7 , a n d a l l t e s t s i n 4 . 8 . T h e p r e s s s h a l l p a s s t h e
Quality conformance inspection shall
4 . 5 Q u a l i t y conformance inspection,
be applied to each press prior to being offered for acceptance under the
conformance
contract.
Unless
otherwise
specified
quality
(see 6.2),
inspection shall consist of the examination in 4.7, the test in 4.$3.2, and the
inspection in 4.9.
The machine shall pass the examination, all tests, and the
inspection to be accepted,
4.6 Acceptance test.
W h e n specified (see 5.2), an acceptance test shall be
performed on each press to ensure conformance with this specification. Unless
otherwise specified (see 6.2), the acceptance test shall
be performed only
after the press is installed at its final location.
The acceptance test shall
consist of the examination
in 4.5.
The machine shall
in 4.7, and all tests
pass the examination and all tests-to be accepted.
4.7 Examination.
E a c h press shall be examined to determine compliance with
all requirements o f t h i s S p e c i f i c a t i o n .
4.8
Tests.
4.8.1 Test conditions.
All tests shall be performed in an indoor facility
with ambient conditions of 41° to 104° Fahrenheit (F) and 20 percent to 95
p e r c e n t r e ; a t o v e h u m iChietck. the source to verify that this is the current version before use.
d y
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business